Daniel Batten
Daniel Batten|4月 16, 2026 20:25
Driving AI datacenter growth without Bitcoin mining is like driving a truck down a Costa Rican highway without shock absorbers: irresponsible and destined to fail. The problem: unlike flexible, predictable Bitcoin mining sites which stabilize grids (Duke) and incentivize renewable energy expansion (Cornell), AI datacenters: 1. Have massive inflexible+unpredictable electricity consumption which actually does strain power grids 2. Have a heavy reliance on baseload thermal energy (aka: fossil fuels) Both problems go away when your datacenter has ~3% Flexible Load from Bitcoin mining. But until AI datacenters catch up, they'll continue to face these sorts of backlashes and bans.(Daniel Batten)
+6
Mentioned
Share To

Timeline

HotFlash

APP

X

Telegram

Facebook

Reddit

CopyLink

Hot Reads