
Daniel Batten|May 15, 2025 14:35
AI datacenters needing 40 GW of energy from US grid
US grid has 70 GW capacity if AI datacenters are able to be flexible load
AI datacenters, when paired with a small amount of Bitcoin mining, becomes a flexible load
Probably nothing
Share To
Timeline
HotFlash
APP
X
Telegram
CopyLink