Charts
DataOn-chain
VIP
Market Cap
API
Rankings
CoinOSNew
CoinClaw🦞
Language
  • 简体中文
  • 繁体中文
  • English
Leader in global market data applications, committed to providing valuable information more efficiently.

Features

  • Real-time Data
  • Special Features
  • AI Grid

Services

  • News
  • Open Data(API)
  • Institutional Services

Downloads

  • Desktop
  • Android
  • iOS

Contact Us

  • Chat Room
  • Business Email
  • Official Email
  • Official Verification

Join Community

  • Telegram
  • Twitter
  • Discord

© Copyright 2013-2026. All rights reserved.

简体繁體English
|Legacy

MARA Holdings to buy Long Ridge Energy in $1.5 billion AI data center push

CN
coindesk
Follow
4 hours ago
AI summarizes in 5 seconds.


What to know : MARA Holdings (MARA) is acquiring Long Ridge Energy & Power for $1.5 billion to power its AI data center expansion. The deal includes a 505 MW gas plant and 1,600 acres in Ohio, offering over 1 GW power capacity for future AI and IT buildout. The acquisition increases MARA's capacity by 65%, adds $144M in annualized adjusted EBITDA, and is expected to close in the second half of 2026.

MARA Holdings (MARA) has agreed to buy Long Ridge Energy & Power in a deal valued at about $1.5 billion. MARA will also assume at least $785 million of debt backstopped by a bridge loan.

The seller, FTAI Infrastructure (FIP), is up 12% in pre-market trading. MARA is ahead 3%.

The deal includes Long Ridge’s 505-megawatt combined-cycle gas plant in Hannibal, Ohio, along with more than 1,600 acres of land, water access, fiber links, fuel supply and grid connections, according to a Thursday filing.

MARA said the site could support more than 1 gigawatt of total power capacity over time.

MARA said the acquisition would raise its owned-and-operated power capacity by about 65% and expand its operating and development pipeline to roughly 2.2 gigawatts across PJM, ERCOT, SPP and international markets.

MARA plans to start construction on an initial AI and critical IT buildout in the first half of 2027, with the first capacity targeted for mid-2028. The company said it does not expect to cut Long Ridge’s current power supply to the PJM grid.

The company expects the Long Ridge assets to add about $144 million of annualized adjusted EBITDA. The deal is expected to close in the second half of 2026.

免责声明:本文章仅代表作者个人观点,不代表本平台的立场和观点。本文章仅供信息分享,不构成对任何人的任何投资建议。用户与作者之间的任何争议,与本平台无关。如网页中刊载的文章或图片涉及侵权,请提供相关的权利证明和身份证明发送邮件到support@aicoin.com,本平台相关工作人员将会进行核查。

|
|
APP
Windows
Mac
Share To

X

Telegram

Facebook

Reddit

CopyLink

|
|
APP
Windows
Mac
Share To

X

Telegram

Facebook

Reddit

CopyLink

Selected Articles by coindesk

33 minutes ago
Senator Warren questions Commerce Secretary Lutnick on Tether loan to family
2 hours ago
A Polymarket-linked bet on the weather in France forecasts a major data issue
2 hours ago
Gemini eyes prediction market challenge to Kalshi, Polymarket, secures derivatives license; shares surge
View More

Table of Contents

|
|
APP
Windows
Mac
Share To

X

Telegram

Facebook

Reddit

CopyLink

Related Articles

avatar
avatarbitcoin.com
4 minutes ago
Global Settlement Network Deploys Onchain Compliance Layer on Canton for Institutions
avatar
avatarDecrypt
7 minutes ago
Agentic Memory: Walrus Takes On AI\\\'s Next Big Bottleneck
avatar
avatarDecrypt
18 minutes ago
Crypto Is the Most Muted Topic on Elon Musk’s X, Ahead of Politics: Product Head
avatar
avatarDecrypt
29 minutes ago
Polymarket Launches Market Integrity Tools Following Soldier’s Insider Trading Arrest
avatar
avatarcoindesk
33 minutes ago
Senator Warren questions Commerce Secretary Lutnick on Tether loan to family
APP
Windows
Mac

X

Telegram

Facebook

Reddit

CopyLink