HIVE Digital Capacity Crosses 10 EH/s in May, Aims to More Than Double That by Year-End

CN
coindesk
Follow
17 hours ago


Bitcoin miner HIVE Digital Technologies (HIVE) has surpassed 10 exahash per second (EH/s) in hashrate capacity, a 58% increase from April, driven by the launch of a 100-megawatt hydro-powered site in Paraguay. The company said in a press release on Friday that it's on track to reach 25 EH/s by the end of 2025.

The firm mined 139 bitcoin in May, or an average rate of 4.5 BTC per day. Peak capacity hit 10.4 EH/s while average hashrate for the month stood at 8.5 EH/s. HIVE said its fleet efficiency remained steady at around 20 joules per terahash (J/TH), and its network share now exceeds 1% of global Bitcoin mining power.

The new facility in Paraguay reflects a broader trend in the mining industry: the race to deploy next-generation ASIC miners rapidly and at scale in regions with abundant renewable power.

Co-founder Frank Holmes emphasized the company’s speed and flexibility, pointing to its Buzz HPC division, which supports AI cloud infrastructure alongside Bitcoin mining. CEO Aydin Kilic said the company’s goal for the summer is 18 EH/s, and that fleet upgrades should allow for a daily BTC output of over 12 by the fourth quarter — potentially at a production cost below $50,000 per coin.

HIVE operates facilities in Canada, Sweden and Paraguay, powered entirely by hydroelectricity. The company was the first publicly listed crypto miner on the TSX Venture Exchange in 2017.

HIVE shares are higher by 13% in New York trade on Friday as the mining sector rallies alongside bitcoin's gain to above $105,000.


免责声明:本文章仅代表作者个人观点,不代表本平台的立场和观点。本文章仅供信息分享,不构成对任何人的任何投资建议。用户与作者之间的任何争议,与本平台无关。如网页中刊载的文章或图片涉及侵权,请提供相关的权利证明和身份证明发送邮件到support@aicoin.com,本平台相关工作人员将会进行核查。

欧易返20%,前100送AiCoin保温杯
链接:https://www.okx.com/zh-hans/join/aicoin20
Ad
Share To
APP

X

Telegram

Facebook

Reddit

CopyLink